WMA HOME PAGEIndex Page

Pit Lake Treatment Slides


Bioremediation of the Sweetwater Pit Lake

Location of the Sweetwater Uranium Project

Sweetwater Uranium Project

Sweetwater Uranium Project - Aerial View

Sweetwater Pit

Sweetwater Pit Water Levels

Wells in the Vicinity of the Sweetwater Pit (1998)

Pit Water Quality

Reclamation Issues

Reclamation Studies

Treatment Method

Treatment Photograph

Treatment Monitoring

Pit Lake During Treatment

Pit Lake After Treatment/Reclamation

Pit Lake Monitoring Locations

Selenium Sampling Results

Uranium Sampling Results

Pre-Treatment Sediment Sampling Results

Post Treatment Sediment Sampling Results

Treatment Process

Conclusions

1.5 Meter Troll Data

6 Meter Troll Data

11 Meter Troll Data

14 Meter Troll Data

Selenium Sampling Results

Uranium Sampling Results

Selenium Sampling Results

Uranium Sampling Results

WMA HOME PAGEIndex Page
Copyright 2003 Wyoming Mining Association
Revised: September 6, 2003
Oscar Paulson