drill rig photographs were taken in 1991 during a drilling project on Green
Mountain near Jeffrey City, Wyoming. The picture to the left shows the rig
set up in the field. Prior to drilling, an area for the rig (the drilling
pad) is prepared. The rig is leveled on this pad and a mud put dug for the
rig unless it is a shallow hole in which case a portable mud pit sometimes
called a "banjo" may be used. When drilling activities are completed the
drilling pad (or location) is reclaimed and reseeded. The reclamation process
includes backfilling the mud pit. |